To request a modular operating room quotation, send suppliers four things: a project summary, the latest floor plan or approximate room dimensions, a list of existing building services, and a clear description of what you want each supplier to provide. If the drawings are still in progress, ask for a budgetary estimate and request a written list of the assumptions behind it.
This checklist helps hospital project teams, contractors, and distributors prepare an inquiry and compare proposals on the same basis. It covers room finishes, HVAC and controls, surgical equipment, and on-site installation and commissioning.
![]()
Start with the project country and city, whether the hospital is new or being renovated, and the number and intended use of the operating rooms. List each room separately if the equipment or scope differs. For example, a general operating room and an orthopedic room planned for mobile imaging may need different equipment layouts and coordination with the building services.
| Information to share | What to include |
|---|---|
| Project location | Country, city, and hospital or project name if available. |
| Project type and stage | New construction or renovation, and whether the project is at concept, tender, or construction stage. |
| Number and use of rooms | Room count and intended procedures or specialty for each room. |
| Areas to include | Operating rooms and any adjacent spaces to be quoted, such as scrub areas or preparation rooms. |
| Target milestones | Requested delivery to site, installation window, and target handover date. |
| Project requirements | Any technical specifications or local requirements already issued by the hospital or its design team. |
For a renovation, tell suppliers whether the operating suite will remain in use during the work and whether rooms will be handed over one at a time. These details help suppliers price site work and plan when installers can access each room. If your schedule is preliminary, identify the milestone that matters most to you, such as delivery before a scheduled hospital shutdown.
Send the latest floor plan and identify its revision. Mark the room boundaries, door openings, planned equipment locations, and any adjacent spaces included in the quotation. If you have a reflected ceiling plan, a ceiling section, or building services drawings, include those too.
If you have only a sketch, send it with approximate dimensions and label the measurements as preliminary. Ask the supplier to identify what must be confirmed by a site survey or coordinated drawings before the estimate can be finalized.
Use the same scope table for every supplier. Ask them to mark each item Included, Optional, By Others, or To Be Confirmed. Where responsibilities are shared, ask the supplier to state where its work ends and the local contractor’s begins.
| Quotation section | Items to list | Responsibility to confirm |
|---|---|---|
| Room finishes | Modular wall and ceiling panels, doors, glazing, flooring, trims, and built-in cabinets. | Who prepares the substrate, makes openings, and finishes joints where the modular system meets the building? |
| HVAC and controls | Air handling unit, ductwork, supply-air ceiling, filtration, room sensors, and control panel, as applicable. | Who supplies each component, runs the cabling, and connects to the building HVAC or control system? |
| Surgical equipment and medical gas interfaces | Surgical lights, operating tables, ceiling pendants, scrub sinks, and medical gas outlets. | Who supplies the equipment, provides structural supports, makes final utility connections, and arranges required testing? |
| On-site installation and commissioning | Site supervision, installation labor, testing and commissioning, handover documents, and training, as applicable. | Does the quote include an on-site crew or supervision? Who performs each test and provides the signed report? |
A quote may list a ceiling pendant as included while assigning the mounting support and final connections to the local contractor. Ask the supplier to show those responsibilities as separate line items. Apply the same check to the air handling unit, medical gas outlets, and any equipment supplied by the hospital.
When comparing proposals, also check whether freight, unloading, and site labor are included. Ask each supplier to state the drawing revision used for pricing and the milestones assumed for production, delivery, and handover. A supply-only package and an installed package should be compared only after the remaining scope has been priced.
Subject: Request for Quotation – Modular Operating Room Project in [City, Country]
Hello,
We are requesting a quotation for [number] modular operating room(s) for a [new hospital / hospital renovation] in [city, country].
Project stage
[Concept / Tender / Construction]
Rooms and intended use
[OR 1 – intended use]
[OR 2 – intended use, if applicable]
[Adjacent areas to include, if any]
Drawings and site conditions
Attached are [floor plan, drawing revision and date, ceiling plan, equipment list, and/or site photos].
The approximate room dimensions and finished ceiling height are [details].
Existing HVAC, electrical, and medical gas connection points are [details / to be confirmed].
Requested scope
Requested delivery to site: [date or month]
Target handover: [date or month]
Project specifications: [attached / to be confirmed]
Please itemize the quotation by scope and identify what is included, optional, or by others. Please state your pricing assumptions, estimated lead time, and any information you need from us before finalizing the proposal.
Best regards,
[Name]
[Company and role]
[Email / Phone]
If your project is still at the concept stage, you can start with the location, room count, intended use, and approximate dimensions. Include any known site constraints so AMBER can review your requested scope and identify what needs to be confirmed for a project-specific quotation.